Before
After The first visit, the dig, the drainage nobody sees, the last cap stone and the first watering. Here is what that looks like on real jobs across Greater Boston, photographed stage by stage.
Old concrete out, drainage in, a segmental wall up, then fencing and a new hydroseeded lawn. One job, photographed in the order it was built.
The old concrete and rubble come out completely. Burying debris under a new wall is the quickest way to get a wall that settles crooked by its second spring.
Most walls that fail in New England fail because of water, not weight. Water trapped behind a wall freezes, expands and pushes. This trench is where it gets carried away instead.
Clean crushed stone fills the trench, so water runs through and out rather than sitting against the back of the block all winter.
The first row is the one that matters. Every course above it copies whatever mistakes are in it, so it gets levelled and checked block by block.
Course by course, with drainage stone behind the block as it rises. Done properly, the wall and the stone behind it work as one structure.
A privacy fence goes up along the top of the new curb wall, and the yard is graded so water runs away from the house and the wall, not toward them.
Seed, mulch and fertilizer go down in one sprayed slurry, timed for the fall window when new grass gets the best start it will have all year.
Wall built and capped, a black metal fence along the top, and the new lawn seeded edge to edge. From broken concrete to a finished yard, with one crew the whole way.
Before
After
Before
After
Before
After No projects in that category yet.
Free on-site estimate. Same crew every visit. 100% satisfaction guaranteed.